Boeing Paint Facility

This project is a single level 29,000 square foot production facility located in Salt Lake City, UT. The building is constructed using a structural steel frame with steel roof joists. The lateral system consists of Buckling Restrained Braces.


Location: Salt Lake City, Utah
Date of Completion: 2012
Size: 30,555 SF


California Avenue Tilt-Up Buildings

This project is made up of a 240,000 square foot and 150,000 square foot tilt-up concrete structures. It has a metal roof deck, prefabricated steel joist and girders. Expansion joints as required with steel special braced frames.


Location: Salt Lake City, Utah
Date of Completion: 2011
Size: 91,273 SF


Wasatch Integrated Waste Recycle

Footings and foundation design for a pre-fabricated steel building. Masonry walls at the perimeter were designed to provide protection.

Photos provided by Nichols Naylor Architects.


Location: Layton, Utah
Date of Completion: 2010
Size: 6,391 SF


UDOT Maintenance Facilities

These facilities involve numerous storage and maintenance bays. It is important to have a very open clear span structure. Additional requirements for the projects involve a building crane running the length of the buildings maintenance and vehicle storage bays. The structural design is able to meet the client's requirements and tight schedule on time and within budget. The following are UDOT Maintenance Facilities BHB has worked on: Jordan Landing, Meadow, Vernal, Brigham, Clearfield, Tooele, Heber, Glendale, Panguitch, Lehi, Cottonwood, Parleys, and Tie Fork Rest Area.


Location: Various
Date of Completion: Various
Size: Various, Utah