Mountain America Corporate Headquarters & Parking Structure

Location: Sandy, Utah
Date of Completion: 2018
Size: 327,000 SF
 

Currently the tallest building in Sandy, the 11-story Mountain America Center houses 2,000 employees and features offices, a medical clinic, gym and restaurant. The adjacent 1,800-stall parking structure is shared by Mountain America and Hale Centre Theater.

The design team considered several options for the office tower. The final solution was concrete over metal floor deck supported by a gravity steel frame. Wind and seismic forces are resisted by concrete shear walls strategically located around stair and elevator cores. This solution provided the best economy while maximizing flexibility in the occupied spaces.

Some of the structural challenges included looking at several options for the foundation system.  A driven pile system was eventually chosen.  Another design challenge was coordinating the parking structure to accommodate access from the Hale Center Theater that was already underway in construction.  The parking structure is constructed with concrete post-tensioned slabs and beams. A series of galvanized angles is attached to the parking exterior to support the exterior metal panel cladding and the large video board on the southwest corner of the parking structure.

Some unique aspects of the design  of the office tower included cantilevered floor plates at levels two and three to minimize structure and create the outdoor patio on the west side of level  three.  An elevated walkway was designed between levels one and two to provide a protected means of egress without occupying valuable floor space on the first floor.


 

Skullcandy Corporate Headquarters

Features a 360 view due to the floor-to-ceiling window design. Amenities include a half-court basketball court, putting green, and a skateboard halfpipe.

 


Location: Park City, UT
Date of Completion: 2016
 


 

AromaTools

AromaTools new facility boast a production area, office, meeting area and a large showroom culminating to a beautiful structure that met the client's needs and product goals. The 24,000 SF two-story facility had a tight deadline with lead time on steel. The panels were poured and erected just in time for the steel. The tilt-up panels had unique shapes with sloped edges of panels at the corners, which were only possible due to the tilt-up method. The panel thicknesses vary with some panels braces at the floors and some going full height unbraced.

 


Location: Pleasant Grove, Utah
Date of Completion: 2015
Size: 24,000 SF
 


 

Boyer 101

This building is designed to service Class A office tenants and consists of a granite, glass exterior with steel frame and concrete construction. It is supported with on-site parking, both at grade and in an on-site parking structure. This property includes a nice plaza area on the corner of the 100 South and 200 East intersection with trees and other landscaping.

 


Location: Salt Lake City, Utah
Date of Completion: 2013
Size: 144,000 SF
 


 

Gateway 6

Gateway 6 is class A office space. Steel bolted end plate moment frames were used to ensure the office views are un-interrupted by structural bracing. The 5 story structure is the anchor for the north end of the Gateway development. The building is beautifully clad with brick veneer. The structure is topped with a large dome and spire.

 


Location: Salt Lake City, Utah
Date of Completion: 2012